This Article indicates where handrails must be continuous and where they can be interrupted. Continuous handrails provide directional cues for sight-impaired persons and reduce the risk of falls for persons with mobility impairment who rely on handrails for support. The guidance and support provided by handrails is particularly important at the beginning and end of ramps and flights of stairs, and at changes in direction, such as at landings and winders.
Affordable, fast and accurate! I help architects and developers prevent costly permit delays before submission. Through pre-submission building code risk reviews, Alternative Solution strategy, and regulatory due diligence, I identify compliance gaps, fire-resistance issues, and approval obstacles — protecting schedules, budgets, and ensuring smooth permit approvals.
Monday, January 23, 2023
9.8.7.2. Continuity of Handrails
For stairs and ramps serving a single dwelling unit or a house with a secondary suite (including their common spaces), handrails must be continuously graspable throughout the length of ramps and flights of stairs, from the bottom riser to the top riser, but are permitted to start from a newel post or volute installed on the bottom tread (Figure 9.8.-13). For other stairs and ramps, at least one required handrail must be continuous throughout the length of the stair or ramp, including at landings except where interrupted by doorways.
Quoted from Illustrated User's Guide - NBC2015
Subscribe to:
Post Comments (Atom)
The Building Code Is Not the Starting Point
After reviewing more than 8,000 building permit applications over the past two decades, I came to an unexpected conclusion: The Building C...
-
1. A distillery plant is proposed on the main floor of a 20 storey residential building. Does this comply with the NBC2020? a) Yes b) No 2....
-
🚨 Overly Conservative Design: A Hidden Cost in Construction �️ In the construction industry, an overly conservative approach to design is...
-
The Hidden Costs of Design Missteps – And How to Avoid Them Over the past 12 years as a professional plans examiner for the City of Calgar...

No comments:
Post a Comment