9.12.3.1. Placement of Backfill
Affordable, fast and accurate! I help architects and developers prevent costly permit delays before submission. Through pre-submission building code risk reviews, Alternative Solution strategy, and regulatory due diligence, I identify compliance gaps, fire-resistance issues, and approval obstacles — protecting schedules, budgets, and ensuring smooth permit approvals.
Saturday, November 25, 2023
9.12.3.1. Placement of Backfill
Sunday, November 19, 2023
Depth of #foundations
Foundation #depths for #decks and other accessible exterior #platforms can be less than the minimums in NBC Table 9.12.2.2. if the deck is not more than one storey and not more than 55 m2 (590 ft.2) in area, the distance from the #ground to the underside of the #joists is 600 mm (2 ft.) or less, the deck does not support a #roof and its movement will not affect the structure it serves (Figure 9.12.-6).
Quoted from Illustrated Users' Guide -- NBC2015
Thursday, November 9, 2023
9.12.1.1. Removal of Topsoil and Organic Matter
9.12.1.1. Removal of Topsoil and Organic Matter
Saturday, November 4, 2023
9.10.13.15. Doors between Garages and Dwelling Units
9.10.13.15. Doors between Garages and Dwelling Units
Existing Buildings: Money Pit or Gold Mine?
An existing building can become a money pit—or a gold mine. Understanding it can make the difference. Before buying or renovating an exist...
-
Architect vs. Building Code Consultant: Understanding the Key Differences When it comes to building design and construction, two critical ...
-
Do I need to provide a fire-resistance rating for a mezzanine under this Article? 3.2.2.81, Group F, Division 2, up to 2 Storeys, Sprinkle...
-
🚨 Overly Conservative Design: A Hidden Cost in Construction �️ In the construction industry, an overly conservative approach to design is...