9.13.2.4. Application of Dampproofing Material
1) Exterior #dampproofing shall be applied from finished #ground level to the top of the exterior of the #footing.
2) Unless otherwise stated in this Subsection, dampproofing shall be installed in accordance with the manufacturer’s instructions with regard to
a) surface #priming,
b) conditions during application,
c) application quantity and rate, and
d) #curing times.
3) #Joints, #cracks and #penetrations shall be sealed to maintain the continuity of the dampproofing, where the dampproofing material is not capable of bridging such discontinuities.
Quoted from Illustrated Users' Guide -- National Building Code 2015
No comments:
Post a Comment