Affordable, fast and accurate! Ask Bing -- The Building Code Consultant and Mentor with experience of code enforcement (12 years in the City of Calgary as Plans Examiner and Safety Codes Officer Engineer, 1 year in the City of Saskatoon as Senior Building Code Engineer, reviewed and approved more than 8000 projects), aims to help building designers and owners saving TIME and MONEY.
Saturday, November 25, 2023
9.12.3.1. Placement of Backfill
Sunday, November 19, 2023
Depth of #foundations
Foundation #depths for #decks and other accessible exterior #platforms can be less than the minimums in NBC Table 9.12.2.2. if the deck is not more than one storey and not more than 55 m2 (590 ft.2) in area, the distance from the #ground to the underside of the #joists is 600 mm (2 ft.) or less, the deck does not support a #roof and its movement will not affect the structure it serves (Figure 9.12.-6).
Quoted from Illustrated Users' Guide -- NBC2015
Thursday, November 9, 2023
9.12.1.1. Removal of Topsoil and Organic Matter
9.12.1.1. Removal of Topsoil and Organic Matter
Saturday, November 4, 2023
9.10.13.15. Doors between Garages and Dwelling Units
9.10.13.15. Doors between Garages and Dwelling Units
How are plans reviewed? -- #23
How are plans reviewed? -- #23 Important definition: Secondary Suite Secondary suite means a self-contained dwelling unit located in a buil...
-
Common strategies used to direct water away from building foundations #Rainwater and #snow-melt that do not drain away from a #foundation ...
-
Quiz There are serious code issues in the following picture. How many can you tell based on the description below? It was one of the Winne...
-
9.15.3.8. Footing Thickness When a #footing supports a foundation, the soil exerts a pressure beneath the footing. Where a footing is wid...