Wednesday, April 9, 2025

🔍 Did the AHJ Conduct a Thorough Review of Your Permit Plans?

 đź”Ť Did the AHJ Conduct a Thorough Review of Your Permit Plans?


If your building permit approval includes an extensive list of generic conditions (e.g., 20+ boilerplate items) that do not address the specifics of your project, this may indicate that your plans were not thoroughly reviewed by the Authority Having Jurisdiction (AHJ).


Why This Matters:

1. Overly broad conditions can suggest a lack of detailed plan examination.

2. Standardized disclaimers (e.g., “Comply with all applicable building codes”) place the responsibility on you without meaningful oversight.

3. Unidentified compliance gaps (structural, fire safety, accessibility, etc.) may lead to costly delays or rework during inspections.


Recommended Actions:

* Seek clarification â€“ Request confirmation from the AHJ that your submitted plans received a detailed review.

* Conduct your own due diligence â€“ Do not assume full compliance based solely on permit issuance.

* Maintain thorough documentation â€“ If discrepancies arise later, records of incomplete review may support resolution.


A permit laden with vague or irrelevant conditions may signify procedural approval rather than substantive compliance verification. Proactive verification is key to mitigating project risks.

#BuildingPermits #Construction #CodeCompliance #AHJ #ProjectManagement #RiskMitigation



🚀 Building Permit Approved? Don’t Celebrate Just Yet! 🚨

 đźš€ Building Permit Approved? Don’t Celebrate Just Yet! 🚨


Just because your building permit was approved doesn’t mean your project is in the clear. In fact, that’s when the real work begins.


I recently reviewed a set of stamped-and-approved architectural plans for a new development. At first glance, everything looked perfect—until we spotted over 20 code violations, including critical life safety and accessibility issues. The shocking part? The AHJ (Authority Having Jurisdiction) had barely reviewed them before issuing the permit.


Here’s the Reality:

âś… Permit approval ≠ Code compliance â€“ The AHJ’s stamp doesn’t guarantee your design meets the Code.

⚠️ Liability falls on YOU â€“ If violations are found later, the owner and design team bear full responsibility—not the AHJ.

🔍 Smart teams double-check â€“ Savvy developers and architects bring in code consultants for an independent review even after permit approval to catch costly oversights.


Why Risk It?

A second review is cheap insurance compared to the cost of redesigns, delays, or—worst-case—legal consequences.

Have you ever discovered code issues after permit approval? Share your lessons below—let’s raise the bar for compliance! 👇

#Construction #Architecture #BuildingCodes #Permitting #RiskManagement #RealEstateDevelopment


Sunday, April 6, 2025

🚧 Partial Permits: Proceed with Caution to Avoid Costly Pitfalls 🚧

 đźš§ Partial Permits: Proceed with Caution to Avoid Costly Pitfalls 🚧


Many developers and contractors view partial permits (or foundation permits) as a milestone—a signal to begin construction. However, this approach often carries significant risks, shifting liability to the owner while creating a false impression of progress.


The Illusion of Progress

Partial permits are frequently issued not because the design is fully compliant, but due to resource constraints within the Authority Having Jurisdiction (AHJ). Despite charging substantial fees, the AHJ may not conduct a thorough review upfront, leaving the owner responsible for unforeseen issues later in the process.


Key Risks of Partial Permits

âś” Full Liability on the Owner â€“ If subsequent reviews reveal major deficiencies, the owner bears the cost of redesigns, delays, and even rework—not the AHJ.

âś” Inflexible Foundations â€“ Structural adjustments mandated after the fact can lead to costly modifications to rebar, footings, and other critical elements.

âś” Wasted Time and Resources â€“ Starting construction before full approval risks rework, doubling both effort and budget if revisions are required.


A More Strategic Approach

🔹 Prioritize Design Quality First â€“ A well-prepared, code-compliant design significantly reduces delays during the approval process. Engage experienced professionals to ensure accuracy before submission.

🔹 Engage a Building Code Consultant â€“ A thorough third-party review can identify compliance gaps early, preventing costly revisions and accelerating permit approval.


Final Thoughts

While partial permits may seem like progress, they represent a calculated risk—one that can lead to substantial financial and logistical consequences if not managed carefully.


Have you encountered challenges with partial permits? How did you navigate them? Share your insights below! 👇

#Construction #RealEstateDevelopment #ProjectManagement #BuildingCodes #RiskMitigation #Architecture #Engineering



🔍 Did the AHJ Conduct a Thorough Review of Your Permit Plans?

  🔍 Did the AHJ Conduct a Thorough Review of Your Permit Plans? If your building permit approval includes an extensive list of generic cond...