#runningman #profile
Affordable, fast and accurate! Ask Bing -- The Building Code Consultant and Mentor with experience of code enforcement (12 years in the City of Calgary as Plans Examiner and Safety Codes Officer Engineer, 1 year in the City of Saskatoon as Senior Building Code Engineer, reviewed and approved more than 8000 projects), aims to help building designers and owners saving TIME and MONEY.
Thursday, July 28, 2022
My Profile Picture
#runningman #profile
Saturday, July 9, 2022
Covered Vehicular Passageway
Ask Bing--The ONLY TRUE BUILDING CODE CONSULTANT, AFFORDABLE, FAST and ACCURATE
587-215-2099, askbing@yahoo.com
Quiz
A covered vehicular passageway serves as a shipping and receiving area. The fire resistance rating of the fire separation between the passageway and the adjoining building shall be not less than:
a) 45min
b) 1h
c) 1.5h
d) 2h
Please have your answer by comments.
#building #passageway
9.19.1.1. Required Venting
9.19.1.1. Required Venting This Article requires that roof #venting provide a means for allowing #moisture that may have found its way in...
-
Common strategies used to direct water away from building foundations #Rainwater and #snow-melt that do not drain away from a #foundation ...
-
Quiz There are serious code issues in the following picture. How many can you tell based on the description below? It was one of the Winne...
-
9.15.3.8. Footing Thickness When a #footing supports a foundation, the soil exerts a pressure beneath the footing. Where a footing is wid...