Monday, May 25, 2020

3.2.5.4. Access Routes

Articles need to know!!! #accessroutes
3.2.5.4. Access Routes
1) A building which is more than 3 storeys in building height or more than 600sqm in building area shall be provided with access routes for fire department vehicles
a) to the building face having a principle entrance, and
b) to each building face having access openings for firefighting as required by Articles 3.2.5.1. and 3.2.5.2.

No comments:

Post a Comment

9.19.1.1. Required Venting

  9.19.1.1. Required Venting  This Article requires that roof #venting provide a means for allowing #moisture that may have found its way in...