How are plans reviewed? — #005

 How are plans reviewed? — #005

Approved design might not be the cost-effective #design.


It is great to have a #permit application approved by the #plans examiner. However, an approved design might not be the cost-effective design. Plans examiners don't care about how much #money we are spending. It is acceptable to them as long as the design meets the minimum requirements of the #Code.

The fact is that huge cost savings can be found in more than 80% of designs in Code compliance.

#costeffective #plansexaminer